Installation Options

Typtical orc installation

  • Customer responsible for the balance
  • Customer responsible for engineering,procuring and installing equipment
  • field Installation is expensive
  • Equipment compatibility issues may occur
  • Expensive custom designed and manufactured enclosure
 

Clear power installation

  • The ClearPower System is packaged in a standard 6 meter /20foot shipping container
  • The air cooled condenser and the exhaust gas heat exchanger are included as part the system
  • Reduces the field engineering costs
 

Clear system with packaging option installation

  • Simplifies installation
  • Factory cost lower thancomparable field installation cost
  • Shipment via truck / rail package comes ready to connect and can include the man door,ventilation package,electric panel,hot water pump ,piping and control wiring or other options the customer may require
  • International shipments would include the package equipment and drawings to quickly modify the container for installation
 

Typical clearpower incinerator installation

  • ClearPower system coupled with an incinerator for the oil and gas industry
  • Permanent or portable applications
  • Provides power to the oil or gas equipment
  • Compensation for electricity exported to the grid
 

Typical clearpower biogas engine integration

  • The ClearPower system integrated with a biogas engine installation
  • Electrical generation efficiency gains of 6 to 10 percent based on engine size
  • Adding a ClearPower waste heat generator to a biogas generator set can result in higher tariff returns based on installation location