Customer responsible for engineering,procuring and installing equipment
Field Installation is expensive
Equipment compatibility issues may occur
Expensive custom designed and manufactured enclosure
Clear power installation
The ClearPower System is packaged in a standard 6 meter /20foot shipping container
The air cooled condenser and the exhaust gas heat exchanger are included as part the system
Reduces the field engineering costs
Clear system with packaging option installation
Simplifies installation
Factory cost lower thancomparable field installation cost
Shipment via truck / rail package comes ready to connect and can include the man door,ventilation package,electric panel,hot water pump ,piping and control wiring or other options the customer may require
International shipments would include the package equipment and drawings to quickly modify the container for installation
Typical clearpower incinerator installation
ClearPower system coupled with an incinerator for the oil and gas industry
Permanent or portable applications
Provides power to the oil or gas equipment
Compensation for electricity exported to the grid
Typical clearpower biogas engine integration
The ClearPower system integrated with a biogas engine installation
Electrical generation efficiency gains of 6 to 10 percent based on engine size
Adding a ClearPower waste heat generator to a biogas generator set can result in higher tariff returns based on installation location