Installation Options
Typtical orc installation
- Customer responsible for the balance
- Customer responsible for engineering,procuring and installing equipment
- Field Installation is expensive
- Equipment compatibility issues may occur
- Expensive custom designed and manufactured enclosure

Clear power installation

- The ClearPower System is packaged in a standard 6 meter /20foot shipping container
- The air cooled condenser and the exhaust gas heat exchanger are included as part the system
- Reduces the field engineering costs
Clear system with packaging option installation
- Simplifies installation
- Factory cost lower thancomparable field installation cost
- Shipment via truck / rail package comes ready to connect and can include the man door,ventilation package,electric panel,hot water pump ,piping and control wiring or other options the customer may require
- International shipments would include the package equipment and drawings to quickly modify the container for installation

Typical clearpower incinerator installation

- ClearPower system coupled with an incinerator for the oil and gas industry
- Permanent or portable applications
- Provides power to the oil or gas equipment
- Compensation for electricity exported to the grid
Typical clearpower biogas engine integration
- The ClearPower system integrated with a biogas engine installation
- Electrical generation efficiency gains of 6 to 10 percent based on engine size
- Adding a ClearPower waste heat generator to a biogas generator set can result in higher tariff returns based on installation location