Installation Options

    Typtical orc installation
    • Customer responsible for the balance
    • Customer responsible for engineering,procuring and installing equipment
    • Field Installation is expensive
    • Equipment compatibility issues may occur
    • Expensive custom designed and manufactured enclosure
    Installation
    Clear power installation
    Installation
    • The ClearPower System is packaged in a standard 6 meter /20foot shipping container
    • The air cooled condenser and the exhaust gas heat exchanger are included as part the system
    • Reduces the field engineering costs
    Clear system with packaging option installation
    • Simplifies installation
    • Factory cost lower thancomparable field installation cost
    • Shipment via truck / rail package comes ready to connect and can include the man door,ventilation package,electric panel,hot water pump ,piping and control wiring or other options the customer may require
    • International shipments would include the package equipment and drawings to quickly modify the container for installation
    Installation
    Typical clearpower incinerator installation
    Installation
    • ClearPower system coupled with an incinerator for the oil and gas industry
    • Permanent or portable applications
    • Provides power to the oil or gas equipment
    • Compensation for electricity exported to the grid
    Typical clearpower biogas engine integration
    • The ClearPower system integrated with a biogas engine installation
    • Electrical generation efficiency gains of 6 to 10 percent based on engine size
    • Adding a ClearPower waste heat generator to a biogas generator set can result in higher tariff returns based on installation location